• image description
  • image description
  • image description

WTOS P-RTC Phosphate control, 1-channel, 90-240V AC, DINrail

Product ID: LXV407.99.01010

Control module for automatic, load-dependant precipitant dosage for phosphate elimination. 1-channel version, 90-240V AC, DINrail mounting.

  • Load-dependent dosage
  • Stable phosphate discharge values
  • Reduced precipitant consumption
  • Low level of sludge generation
  • Simple installation

The real-time controller is designed to optimise chemical phosphate elimination at biological waste water treatment plants.
Based on the current phosphate load, the module automatically calculates the minimum amount of precipitants needed to reliably meet the required discharge values.
In addition, the reduced precipitant consumption also lowers the amount of sludge generated. This in turn lowers the costs incurred from sludge dewatering and removal.

Depth96 mm
Height120 mm
Operating Temperature Range0 to 55 °C
Power Requirements (Hz)50/60 Hz
Power Requirements (Voltage)90 - 240 V AC
Protection classIP20

Data sheet/Brochures

TitleLanguageSizeTypeSend to a friendDate 
W.T.O.S. Water Treatment Optimisation Solutions
The need to operate in a sustainable fashion provides the modern WWTP with a unique challenge. Reducing costs whilst fulfilling ever stricter discharge consents, even in the event of sudden load peaks, is key. With W.T.O.S. modules for process optimisation, these requirements can now be fulfilled. 4 pages
English, English6,210 KB PDF2012-06-21_logo

Manuals

TitleLanguageSizeTypeSend to a friendDate 
User manual: PROGNOSYS
Edition 4A
English, English712 KB PDF2013-03-13_logo
User Manual WTOS P-RTC
Edition 3A
English, English1,380 KB PDF2011-09-14_logo

Practice Reports

TitleLanguageSizeTypeSend to a friendDate 
W.T.O.S.: Regulation of reagent injection for phosphate - Evry urban community
The treatment plant for the Evry Centre Essonne urban community in France operates on the principle of low-load activated sludge aeration. The effluent undergoes pre-treatment (involving screening, grit removal and grease removal). After this stage, the wastewater is directed towards two primary settling tanks before being transferred to the biological channel, which comprises an anoxic area, an aeration tank and two clarifiers.
English, English1,065 KB PDF2013-01-03_logo

Accessories

  • available

SC 1000 Display module with GSM, touchscreen

LXV402.99.01001
  • available

PHOSPHAX sc Phosphate analyser on-site, 0.05-15 mg/L, 1 channel

LXV422.99.13001
  • available

WTOS communication card WTOS communication card

YAB117

Service contracts

  • available

TSE-COM-WTOS-P WTOS Commissioning package Phosphate system

TSE-COM-WTOS-P
  • available

TSE-CC-RTC Comfort contract WTOS RTC Industry - PC

TSE-CC-RTC
  • available

TSE-DIAG-Y1 Remote Diagnosis Network 1 Jahr bis zu 5 Sensoren

TSE-DIAG-Y1